Spokane Billboard Permit Offices & Bylaws
Spokane, Washington regulates billboards and other outdoor signs through city sign rules and a permitting process administered by city permitting and planning offices. This guide explains where to file applications, which municipal provisions typically control billboards, what enforcement and penalties to expect, and practical steps to apply, pay, appeal, or report an unpermitted sign in Spokane.
How to start
Begin by confirming whether the proposed billboard site is within city zoning that allows commercial signage and by checking Spokane's sign regulations and permit requirements. Official sign rules and zoning standards are available on the city's municipal code and permit pages; consult them before preparing drawings or paying fees. Spokane Municipal Code - Signs[1]
- Prepare site plan, elevation, and structural details as required for a sign permit.
- Confirm zoning and special district rules that may restrict billboards.
- Contact the Development Services Center for pre-application guidance.
Applications & Procedures
Sign permits for billboards are processed through the City of Spokane permitting route. Submit completed applications, required plans, any structural calculations, and payment to the Development Services Center. The city provides sign permit information and instructions on its permit pages. City of Spokane - Sign Permits[2]
- Complete the sign permit application and supply drawings and engineering where required.
- Pay application and review fees as listed on the permit page or at submittal.
- Schedule any required inspections after installation.
Penalties & Enforcement
Enforcement of sign and billboard rules in Spokane is carried out by city enforcement staff and the Development Services/Planning offices. The municipal code and enforcement pages describe prohibited signs, removal authorities, and penalty structures; specific fine amounts and escalation for first, repeat, or continuing offences are not specified on the cited city permit or code summary pages and must be verified on the applicable municipal code sections or by contacting enforcement staff directly. WSDOT - Outdoor Advertising[3]
Typical enforcement actions
- Monetary fines for violations - amount not specified on the cited page.
- Removal or abatement orders requiring sign removal or modification.
- Citation to municipal court or administrative hearing for unresolved violations.
- Stop-work orders on unpermitted construction or installation.
Appeals and review
The city provides appeal or variance routes for permit denials or enforcement orders; time limits for filing appeals are not specified on the general permit pages and should be confirmed with the office that issued the notice or by reviewing the specific municipal code section cited on the notice.
Applications & Forms
- Sign Permit Application (city form) - name and number not specified on the cited page; obtain the current application from the Development Services Center or the city's permit webpage.
- Fee schedule - not specified on the cited page; pay at submittal or as directed on the permit page.
Action steps
- Confirm zoning and allowed sign types at the municipal code and planning pages.
- Prepare drawings and engineering for submission to Development Services.
- Submit application, pay fees, and schedule inspections.
- If denied, file appeal within the time stated on the denial or contact the issuing office for appeal deadlines.
FAQ
- Where do I file a billboard permit in Spokane?
- File sign and billboard permit applications with the City of Spokane Development Services Center; check the municipal sign code first for standards. Sign permit info[2]
- Are billboards allowed on state highways within the city?
- State-controlled outdoor advertising along highways is regulated by WSDOT and may require separate state permits in addition to city permits. WSDOT outdoor advertising[3]
- What if someone installs a billboard without a permit?
- Report unpermitted signs to city code enforcement or Development Services; enforcement options include orders to remove and fines. Contact details are on city permit and enforcement pages. Sign code[1]
How-To
- Confirm zoning and applicable sign standards in the Spokane Municipal Code and any overlay districts.
- Prepare permit drawings, structural calculations, and a site plan per city requirements.
- Submit the sign permit application and attachments to the Development Services Center and pay required fees.
- Address plan review comments, schedule required inspections, and obtain final approval before placing the billboard into service.
Key Takeaways
- Start with Spokane's sign code to determine if a billboard is permitted.
- Use the Development Services Center for applications and pre-submittal guidance.
- Enforcement can include removal orders and fines; confirm amounts with the issuing office.
Help and Support / Resources
- City of Spokane - Sign Permits
- City of Spokane - Development Services Center
- Spokane Municipal Code (search signs)
- Washington State DOT - Outdoor Advertising