Arlington Green Infrastructure Bylaws & Carbon Caps
Arlington, Virginia has multiple programs and local code provisions that affect green infrastructure incentives, stormwater management, and municipal approaches to limiting greenhouse gas emissions. This guide summarizes how Arlington implements incentives for green roofs, rain gardens, permeable paving and stormwater fee credits, explains enforcement and penalties, and outlines steps property owners and developers can take to apply, comply and appeal. Where the county code or program pages do not state specific fines or fees, the text notes that the amount is "not specified on the cited page" and points to the responsible offices for confirmation and forms.
Overview of Green Infrastructure Incentives
Arlington promotes green infrastructure through incentives, technical guidance and stormwater crediting designed to reduce runoff and improve water quality. Programs include design guidance, potential fee credits for approved best management practices, and targeted incentives for green roofs and on-site stormwater controls. For program details and eligibility, see the Office of Sustainability and Environmental pages.Office of Sustainability[2]
- Stormwater fee credits for on-site management where eligible.
- Technical assistance and design resources for green roofs, rain gardens, and permeable pavement.
- Targeted rebates or incentive programs when funded or available.
- Review and approval processes tied to site plans, permits, and inspections.
Penalties & Enforcement
Responsibility for enforcement of stormwater and environmental controls in Arlington rests with the Department of Environmental Services or the designated county enforcement office. Inspections are typically performed by county staff and complaints can be submitted to the enforcing office for investigation.Department of Environmental Services[1]
- Fines: specific monetary amounts are not specified on the cited page; see the official enforcement pages for current schedules.
- Escalation: first, repeat, and continuing offence treatments are not specified on the cited page and may be set by ordinance or administrative rule.
- Non-monetary sanctions: orders to correct, stop-work orders, permit suspensions, removal or remedial works, and referral to court are possible enforcement actions.
- Appeals and review: appeal routes and time limits vary by permit or ordinance; the cited enforcement pages should be consulted for specific appeal deadlines and hearing procedures.
Applications & Forms
Applications for permits, stormwater credits, or incentives are managed through county program pages and the county code may reference required forms. Specific form names, numbers, fees and submission portals are not uniformly published on a single page; consult the county code and program pages for current forms and instructions.Arlington County Code[3]
- Typical submissions: site plan materials, stormwater control design, maintenance agreements.
- Fees: not specified on the cited page; check the permit or program page for fee schedules.
- Deadlines: permit review timelines vary; pre-application meetings are recommended.
Compliance Steps and Best Practices
- Early coordination: contact county sustainability or environmental services before design to confirm eligibility and crediting.
- Document design and maintenance plans to show long-term compliance.
- Keep inspection logs and as-built documentation for review during crediting or audit.
FAQ
- What incentives are available for green roofs and rain gardens?
- Arlington offers technical guidance and may offer fee credits or targeted incentives; specific programs and availability are listed on the county sustainability pages.Office of Sustainability[2]
- Who enforces stormwater and green infrastructure rules?
- The Department of Environmental Services enforces applicable code provisions and inspects stormwater controls; submit complaints or requests for inspection through their official contact channels.Environmental Services[1]
- How do I apply for a stormwater fee credit?
- Submit required design and maintenance documentation with the permit or stormwater credit application; exact forms and fees are listed on program pages and in the county code.Arlington County Code[3]
How-To
- Contact Arlington Environmental Services or the Office of Sustainability for pre-application guidance.
- Prepare site plans and stormwater control designs consistent with county technical guidance.
- Submit applications and required documentation through the county permit portal or as directed by the program page.
- Complete construction, schedule inspections, and file as-built and maintenance agreements to qualify for credits.
- If assessed fines or violations, follow appeal instructions on the enforcement notice and consider contacting the enforcement office promptly.
Key Takeaways
- Engage county staff early to confirm eligibility for incentives and credits.
- Maintain thorough records and agreements to preserve credits and meet inspections.
Help and Support / Resources
- Arlington County Department of Environmental Services
- Office of Sustainability - Arlington
- Arlington County Code (Municode)