Sign Permits - New South Memphis, Tennessee

Signs and Advertising Tennessee 4 Minutes Read ยท published February 08, 2026 Flag of Tennessee

In New South Memphis, Tennessee, sign permits and rules for commercial and temporary signage are administered as part of the City of Memphis permitting and code system. This guide explains which city office issues permits, who enforces sign bylaws, common violations, and the practical steps to apply, appeal, or report an unlawful sign. Where the municipal code text or fees are not explicit on the cited official pages, this article notes that fact and points to the controlling agency for forms and contacts. Information is current as of February 2026 unless a last-updated date appears on the cited page.

Penalties & Enforcement

The City of Memphis is the municipal authority overseeing sign permits and enforcement in New South Memphis. Day-to-day permit review and enforcement are managed by the City of Memphis Division of Planning and Development and code enforcement staff; permit intake and inspections are typically handled through the city's permitting office (Planning & Development)[1]. The municipal zoning and sign rules are published in the City of Memphis Code of Ordinances; specific sign standards and zoning sections are available from the municipal code publisher (City of Memphis Code)[2]. If numeric fines, schedules, or civil penalties are not listed on those pages, the page(s) are noted as "not specified on the cited page."

  • Fines: not specified on the cited page; many municipal sign violations are enforced as civil infractions or code violations with fines set by ordinance or administrative schedule.
  • Escalation: first offence, repeat, and continuing violations are handled per code enforcement policy; ranges and per-day continuing penalties are not specified on the cited page.
  • Non-monetary sanctions: orders to remove or alter signs, stop-work or removal orders, and court enforcement actions are available under municipal authority; specific procedures are in the code or administrative rules.
  • Enforcer and complaints: file complaints or request inspections through the City of Memphis Code Enforcement / Permitting contact points listed on the Planning & Development pages.
  • Appeals and reviews: appeals of administrative permit denials or sign enforcement typically go to the Board of Adjustment or an administrative hearing process; time limits and filing requirements are set by ordinance or board rules and are not fully specified on the cited pages.
Always document the sign location and take dated photos before reporting a violation.

Applications & Forms

Permits for new permanent signs, replacements, temporary banners, and certain electrical work usually require a sign permit application and may need plan drawings and structural or electrical permits. The official permit intake form name and fee schedule are not fully published on the linked pages; applicants should use the city's permitting portal or contact Planning & Development for the current Sign Permit Application and fee list (Planning & Development)[1].

  • Form name: Sign Permit Application (name and form number not specified on the cited page).
  • Fees: not specified on the cited page; check the permitting portal or contact the permitting office for fee schedule.
  • Deadlines: typical review times vary by application complexity; specific deadlines or expedited options are not specified on the cited page.
  • Submission: online permitting portal or in-person at the city permitting counter as directed by Planning & Development.
If a sign involves electrical work, secure both the sign permit and the electrical permit before installation.

Common Violations

  • Unpermitted permanent signs installed without a permit.
  • Signs exceeding allowed size, height, or illumination rules.
  • Improperly mounted or structurally unsafe signs.
  • Temporary signs left beyond allowable display periods.

FAQ

Who issues a sign permit for a storefront in New South Memphis?
The City of Memphis Division of Planning and Development issues sign permits and coordinates inspections; applicants should use the city's permitting portal or contact the planning office for steps and forms.
How long does sign permit review take?
Review time varies by application complexity; no single guaranteed timeframe is specified on the cited pages, so check the permitting portal or contact Planning & Development.
What if a neighbor's sign is unsafe or violates rules?
Report suspected unsafe or noncompliant signs to City of Memphis code enforcement or the permitting office for inspection and possible enforcement action.

How-To

  1. Confirm zoning and sign standards in the City of Memphis Code to determine permitted sign types and limits.
  2. Gather required documents: site plan, sign dimensions, elevation drawings, ownership consent, and electrical plans if applicable.
  3. Submit the sign permit application through the City of Memphis permitting portal or at the permitting counter.
  4. Pay applicable fees and track the application; respond promptly to any review comments or requests for additional information.
  5. Schedule inspections for structural or electrical work as required and obtain final approval before activating or illuminating the sign.
  6. If denied, review the denial notice for appeal steps and file an appeal with the Board of Adjustment or follow administrative appeal procedures within the stated time limits in the denial (time limits may be set by ordinance and are not fully specified on the cited pages).

Key Takeaways

  • Sign permits in New South Memphis are handled through City of Memphis permitting and Planning & Development.
  • Always confirm zoning standards and obtain required electrical permits before installation.
  • Report unsafe or unpermitted signs to city code enforcement for inspection.

Help and Support / Resources


  1. [1] City of Memphis Planning & Development - Permits and Planning
  2. [2] City of Memphis Code of Ordinances - Sign and zoning regulations