Sign Permit Guide - New South Memphis, Tennessee

Signs and Advertising Tennessee 3 Minutes Read · published February 08, 2026 Flag of Tennessee

Overview

This guide explains how to apply for a sign permit in New South Memphis, Tennessee, who enforces sign rules, typical timelines, and where to submit applications. New South Memphis follows the City of Memphis permitting and sign regulations; applicants should consult the city planning and development resources for official forms and submission instructions City sign permit page[1]. Where the neighborhood has special district rules, the local planning office will identify overlay requirements.

Penalties & Enforcement

The City enforces sign regulations through code enforcement and development services. Specific monetary fines and daily penalties for sign violations are not specified on the cited page; consult the municipal code for text and any civil penalty schedule City of Memphis Code of Ordinances[2].

  • Monetary fines: not specified on the cited page; check the municipal code for amounts and per-day calculations.
  • Escalation: first, repeat, and continuing offences—ranges and escalation rules are not specified on the cited page.
  • Non-monetary sanctions: orders to remove or abate signs, stop-work directives, and potential court actions are used; exact procedures are set out in city enforcement rules.
  • Enforcer: City of Memphis Code Enforcement and Development Services review and inspect sign installations; complaints and inspections are handled through the development services portal.
  • Appeals and review: appeal routes and timelines are governed by city administrative procedures; specific appeal time limits are not specified on the cited page.
If a fine amount or appeal period is required for your case, request the enforcement notice in writing from the city.

Applications & Forms

Sign permit applications, required drawings, and structural documentation are filed through the city development services portal or submitted to the planning office; the municipal permit portal lists the current application and submittal checklist Development services - permits & licensing[3]. Fees and whether a structural engineer stamp is required vary by sign type.

  • Form name: Sign Permit Application (official city form; see development services portal for the current PDF or e-permit form).
  • Fee: fee schedule is posted with permit types on the development services page; if not listed, the fee is not specified on the cited page.
  • Deadlines: typical review timelines vary by workload and application completeness; expedited review options may be offered by development services.
  • How to submit: online via the city permit portal or deliver to the Development Services office as described on the permits page.
Always include clear dimensions, site plan, and attachment details to reduce review delays.

Common Violations

  • Signs installed without a permit.
  • Nonconforming sign size or location.
  • Unsafe or improperly mounted signs creating public hazard.

Action Steps

  • Confirm zone and overlay rules with Planning.
  • Prepare drawings and structural info; complete the sign permit application.
  • Pay the applicable fee via the permit portal or at the office.
  • Schedule inspections after installation if required.

FAQ

Do I need a permit for a temporary banner?
Most temporary banners require a permit or written authorization; check the sign permit rules and temporary sign provisions in the municipal code.
How long does review take?
Review time depends on completeness and workload; expedited options may be available through development services.
Who enforces sign removals?
City Code Enforcement and Development Services enforce removals and abatement orders for unsafe or illegal signs.

How-To

  1. Confirm zoning and sign district restrictions with the Planning office.
  2. Gather site plans, elevations, dimensions, and structural attachments.
  3. Complete the official Sign Permit Application and assemble required documentation.
  4. Submit via the city permit portal or deliver to Development Services and pay the fee.
  5. Respond to reviewer comments and obtain final approval.
  6. Schedule inspection(s) if the permit requires structural review after installation.
Begin early: some sign permits require coordination with utilities or building permits.

Key Takeaways

  • Always check the City of Memphis sign rules before ordering signage.
  • Complete applications with full measurements and attachment details to avoid delays.
  • Contact Development Services or Code Enforcement early for clarifications.

Help and Support / Resources


  1. [1] City sign permit page
  2. [2] City of Memphis Code of Ordinances
  3. [3] Development Services - permits & licensing