New South Memphis Parking and EV Charging Ordinances
New South Memphis, Tennessee follows city zoning and building rules for off-street parking minimums and electric vehicle (EV) charger installations. This guide summarizes how parking ratios and EV-ready or EV-capable requirements are addressed at the municipal level, where to find official standards, and practical steps for developers, property owners, and contractors to comply locally in New South Memphis.
Parking minimums and zoning overview
Most parking space minimums are set in the municipal zoning code and vary by land use (residential, commercial, industrial) and overlay districts. Developers should check the Division of Planning for the applicable parking ratio and any district-specific adjustments. Memphis Division of Planning - Zoning & Standards[1]
EV charging provisions
Local rules may require EV-ready parking stalls, electrical capacity, or permits for EV charger installation; requirements often reference building and electrical codes and may intersect with state or utility incentives. For project permits and code interpretations, consult municipal planning and building permit offices.
Penalties & Enforcement
Enforcement is typically handled by the city code enforcement or parking services unit; fines, orders to remedy, or citations may be issued for noncompliance with parking, zoning, or permitting requirements. Where exact penalty amounts or escalation steps are not published on the controlling page, this guide notes that fact and points to official contacts for confirmation.
- Fine amounts: not specified on the cited page; see official enforcement contact below for current schedules.
- Escalation: first offence or continuing offence ranges not specified on the cited page; municipalities may impose daily continuing fines or civil penalties.
- Non-monetary sanctions: stop-work orders, compliance orders, permit suspension, or abatement actions may be used.
- Enforcer and complaint pathway: City Code Enforcement / Parking Services; submit complaints or view enforcement procedures on the official Code Enforcement page.Code Enforcement[2]
- Appeals: appeal or review procedures and time limits vary by ordinance; specific deadlines are not specified on the cited page and must be confirmed with the enforcing office.
Applications & Forms
Common submissions include zoning variance requests, building permits for electrical work, and parking plan reviews. Specific form names, numbers, fees, and submission portals are provided by the Division of Planning and Building Permits pages; if a named form or fee is not published, it is noted as not specified on the cited page.
- Zoning variance / special exception: see Division of Planning for application and fee (not specified on the cited page).
- Building permit for charger installation: electrical permit requirements and inspection scheduling available from Building Permits (fees not specified on the cited page).
How to comply
- Confirm zoning district and applicable parking minimums with the Division of Planning.[1]
- Design parking and EV infrastructure to meet local code and building/electrical permit standards; prepare site plans indicating EV-ready stalls.
- Apply for required permits: zoning review, building and electrical permits; include manufacturer specs for chargers.
- Schedule inspections for electrical connections and obtain final occupancy or compliance confirmation.
- If enforcement action occurs, contact Code Enforcement for remedies and appeal procedures.[2]
FAQ
- How many parking spaces are required for new residential developments?
- Requirements depend on zoning and use; check the Division of Planning for the applicable parking ratio.[1]
- Are EV chargers required for new developments?
- Some jurisdictions require EV-ready spaces or electrical capacity; local requirements should be confirmed with Planning and Building Permits.
- Who enforces parking and EV-related code violations?
- Code Enforcement and Parking Services typically enforce these rules; contact the city enforcement office for reporting and remedies.[2]
How-To
- Identify property zoning and review parking/EV requirements on the municipal planning page.
- Prepare site plans showing required number of stalls and locations for EV-ready spaces.
- Obtain building and electrical permits for charger installation from the city.
- Complete inspections and secure final approvals before placing chargers into service.
Key Takeaways
- Parking minimums and EV requirements are determined by zoning and building codes.
- Permits and inspections are required for EV charger installations.