In Reno, Nevada new construction that requires sanitary sewer service must meet city utility standards and obtain the necessary permits before final occupancy. This guide summarizes the typical requirements administered by the City of Reno Utilities and Building Safety divisions, explains approval steps, inspection expectations, and how enforcement works for connections to the municipal sewer system. Where specific numeric fees or fines are not published on the cited official pages, the text notes that explicitly and points to the enforcing office for the current schedule.

Requirements for New Construction Sewer Connections

Developers and property owners must confirm sewer availability and capacity with the City of Reno Utilities, design on approved standards, and complete required permits through Building Safety. Typical requirements include connection to the public sewer main, installation of private lateral piping to city standards, backflow prevention where required, and payment of system development or connection charges when applicable. Confirm pipe materials, invert elevations, and cleanout placement with plan review comments from the Utilities or Building Safety reviewers. [1]

Contact Utilities early to confirm capacity and avoid redesign delays.

Permits, Plans, and Fees

  • Submit building permit applications with sewer connection details to Building Safety; separate utility service applications may be required.
  • Provide engineered sewer plans stamped by a licensed civil engineer when project thresholds require them.
  • Pay applicable permit fees and system development charges; specific fee amounts are available from the cited department pages or fee schedules.
  • Schedule inspections at required stages: lateral installation, pressure/leak tests, and final sewer tie-in inspection.

Inspections & Connection Process

Inspections are coordinated through the Building Safety division for construction and through Utilities for tie-ins to the public main. Work in the public right-of-way may also require an encroachment or street-cut permit and coordination with Public Works. Confirm required inspection hold points on approved plans and obtain final acceptance before covering any work.

Do not backfill or cover utility connections before an approved inspection.

Penalties & Enforcement

The City of Reno enforces sewer connection standards through its Utilities and Building Safety divisions and may escalate matters to municipal code enforcement or the city attorney when necessary. Specific monetary fines and penalty schedules for unauthorized connections, illegal discharges, or failure to obtain permits are not specified on the cited department pages; contact the enforcing office for the current penalties and procedures. [1]

  • Enforcer: City of Reno Utilities and Building Safety; complaints and inspections are handled by those departments.
  • Monetary fines: not specified on the cited page.
  • Escalation: first notices, correction orders, and further administrative or court action as needed; exact escalation steps and ranges are not specified on the cited page.
  • Non-monetary sanctions: correction orders, stop-work directives, permit revocation, or court referral may be used.
  • Inspection and complaint pathway: submit service requests or complaints to Utilities or Building Safety using the official contact pages cited below.
  • Appeals and review: appeal procedures and time limits are not specified on the cited pages; contact the enforcing department for appeal deadlines and processes.
Keep documentation of permits, plan approvals, and inspections to support appeals or compliance discussions.

Applications & Forms

The City publishes permit applications and utility service request forms through Building Safety and Utilities. Where a separate sewer service application exists, details such as form name/number, fees, and submission instructions are provided on the department pages linked here; if a specific form number is not shown there, it is not specified on the cited page. [2]

How-To

  1. Confirm sewer availability with City of Reno Utilities and request capacity or extension requirements.
  2. Prepare site and sewer plans; obtain engineer stamps if required and submit with the building permit application.
  3. Pay permit and connection fees as published by the City during plan review or on the department fee schedules.
  4. Schedule and pass required inspections for lateral installation, tests, and public main tie-in.
  5. Obtain final acceptance and any required utility service activation from Utilities before occupancy.

FAQ

Who must connect to the City sewer for new construction?
The property owner or developer must connect to the municipal sewer system where service is available and required by code; exceptions or variances must be approved by the city.
When do I need a separate utility service application?
A separate utility service application may be required in addition to a building permit for new service connections or capacity requests; check Utilities procedures on the official page.
What if the public sewer main is not adjacent to my site?
If no public main exists, extension or off-site improvements may be required and are reviewed by Utilities; costs and agreements depend on project scope and are addressed during plan review.

Key Takeaways

  • Contact City of Reno Utilities early to confirm capacity and requirements.
  • Submit complete sewer details with building permits to avoid delays.
  • Do not cover work before inspections; retain records for appeals.

Help and Support / Resources


  1. [1] City of Reno Utilities - official department page
  2. [2] City of Reno Building Safety - permits and inspections