Des Moines Parking Minimums and EV Requirements

Land Use and Zoning Iowa 3 Minutes Read · published February 10, 2026 Flag of Iowa

Developers planning residential or commercial projects in Des Moines, Iowa must assess local parking minimums and any electric vehicle (EV) infrastructure requirements early in design and permitting. The City of Des Moines zoning and municipal code contain the controlling parking ratios, loading rules and any EV provisions; consult the Des Moines Municipal Code for zoning tables and definitions Des Moines Municipal Code[1].

Early coordination with planning staff reduces costly redesigns.

Overview of parking and EV rules

Parking minimums are set in the city zoning sections that apply by zoning district and land use type. EV requirements may appear either as a standalone ordinance or as part of building and electrical permit rules; where present, they typically address minimum numbers of EV-ready or EV-capable spaces, conduit/electrical capacity, and preferred locations. If zoning, subdivision, or site-plan rules conflict, developers should follow the applicable controlling instrument and confirm requirements with city staff.

Penalties & Enforcement

Enforcement responsibility typically lies with City of Des Moines planning and code enforcement units and with parking enforcement or public works for on-street matters. Specific monetary fines, escalation, and exact administrative penalties are not specified on the cited municipal code overview page and must be confirmed in the controlling ordinance or enforcement rule referenced by permit decisions.

Check the municipal code section for enforcement language before submitting plans.
  • Enforcer: City of Des Moines Planning/Permitting and Code Enforcement (see Resources).
  • Fines: not specified on the cited page; see the municipal code or enforcement notices for amounts.
  • Escalation: first/repeat/continuing offence provisions are not specified on the cited overview page.
  • Non-monetary sanctions: stop-work orders, requirements to remove noncompliant construction, or court actions may be authorized by ordinance.
  • Inspections & complaints: use the city permitting contact or official complaint portal; see Resources below for contact links.
  • Appeals & review: permit and zoning decisions typically have administrative appeal paths; specific time limits are not specified on the cited overview page.

Applications & Forms

  • Site plan review application (required where projects trigger site review); check Planning for form and fee.
  • Building permit (includes code compliance for electrical work and EV charger installations).
  • Permit fees vary by project type and are published on permit pages; where no fee is published, fee is not specified on the cited page.

Common compliance steps for developers

  • Confirm applicable zoning district and parking ratio in the municipal code and zoning tables.
  • Include required EV-ready spaces or conduit in electrical/site plans if the local ordinance or building code requires them.
  • Submit site plan and building/electrical permit applications early; include dimensions and EV infrastructure notes.
  • Address any required variances or waivers through the planning board or zoning board process.

FAQ

What are the parking minimums for multifamily housing?
Parking minimums vary by zoning district and unit mix; consult the municipal zoning tables in the code and confirm with Planning staff.
Does Des Moines require EV chargers for new construction?
Any EV charger or EV-ready requirement will appear in the applicable municipal or building code section; confirm on the code page and with permit staff.
How do I get a variance from parking minimums?
Apply for a variance or waiver through the city’s planning or zoning board process; the process details and forms are available from the Planning Division.

How-To

  1. Review the zoning district and parking tables for your property to determine the baseline parking requirement.
  2. Design EV infrastructure to meet any local EV-ready or EV-capable rules and include conduit and electrical capacity in plans.
  3. Prepare and submit site plan and building/electrical permit applications, attaching calculations and plans showing parking layout and EV locations.
  4. If required, apply for a variance or reduction with supporting evidence (shared parking study, transit access, or demand analysis).
  5. Respond to plan review comments promptly and schedule required inspections during construction.
Document EV electrical capacity now to avoid retrofit costs later.

Key Takeaways

  • Parking minimums are set in zoning tables by land use and district.
  • EV requirements may appear in zoning or building/electrical rules; check both.
  • Engage Planning and Permits early to reduce review delays.