Savannah Utility Excavation Permit - Contractor Guide

Utilities and Infrastructure Georgia 3 Minutes Read · published February 21, 2026 Flag of Georgia

Savannah, Georgia contractors must follow city rules for excavating in public rights-of-way, coordinating with utility owners and securing the proper permits before digging. This guide explains the typical municipal permit process, required notices, inspection steps, common compliance problems, and how enforcement works so contractors can plan schedules, budgets, and safety measures for excavation and utility work in Savannah.

Permit overview and who must apply

Any contractor or utility performing excavation or work in the public right-of-way typically needs a city right-of-way or excavation permit and must locate utilities before digging. Contact the City of Savannah Public Works for permit applications and specifications Right-of-Way Permit[1]. Call 811 or use the statewide utility locating service before any excavation Georgia 811[2].

Always call 811 before you dig.

Typical application steps

  • Prepare a permit application including site plans, traffic control plan, and contractor credentials.
  • Submit application to the City of Savannah Public Works or Development Services as required.
  • Provide proof of utility notifications and positive response from utility owners or 811 clearance.
  • Pay permit fees, bonds, or restoration deposits where required.
Permit requirements vary by location and scope of work.

Applications & Forms

The city publishes a Right-of-Way/Excavation permit application and related specifications on the Public Works permit page; specific form names, form numbers, and fee amounts are not specified on the cited page.[1]

Inspections, safety and compliance

Permits commonly require an approved traffic control plan, erosion control, restoration to city standards, and on-site inspection by city staff. Coordinate inspections and final acceptance with Public Works or the assigned inspector named on the permit.

Keep a copy of the approved plan and permit on-site until final sign-off.

Penalties & Enforcement

The City of Savannah enforces excavation and right-of-way rules through Public Works and code enforcement. Specific fine amounts, escalation, and exact monetary penalties are not specified on the cited permit page; consult the City of Savannah enforcement contacts for current penalties.[1]

  • Fines: not specified on the cited page.
  • Escalation: first, repeat, and continuing offence treatment not specified on the cited page.
  • Non-monetary sanctions: stop-work orders, required restoration, permit suspension, or court action may be used.
  • Enforcer: City of Savannah Public Works and Code Enforcement; contact via the city departmental pages for inspections and complaints.[1]
  • Appeals: specific appeal procedures and time limits are not specified on the cited page; parties should follow the city appeal/review process published by the enforcing department.
If cited, act quickly to request review and to document compliance steps.

Applications & Forms

The official Right-of-Way or Excavation permit application and submission instructions are available from City of Savannah Public Works; fee schedules and submission deadlines are not specified on the cited page.[1]

Common violations

  • Excavating without a permit or off-permit hours.
  • Failure to notify utilities or to obtain 811 clearance.
  • Poor restoration of pavement, sidewalks, or landscaping.
  • Inadequate traffic control or safety measures.

FAQ

Who must obtain an excavation permit?
Contractors and utility companies performing work in the public right-of-way generally must obtain a permit; confirm with City of Savannah Public Works.[1]
Do I need to call 811?
Yes. Contact Georgia 811 to have underground utilities located before digging.[2]
How long does permit approval take?
Processing times vary; typical timelines are not specified on the cited page—contact the permitting office for current turnaround times.[1]

How-To

  1. Confirm your project is within the public right-of-way and identify the affected city jurisdiction.
  2. Call Georgia 811 and obtain utility locates; retain documentation of clearance.[2]
  3. Prepare permit application, site plans, traffic control and restoration plans.
  4. Submit the application to City of Savannah Public Works and pay any required fees.[1]
  5. Schedule and pass required inspections during and after excavation.
  6. Complete restoration to city standards and obtain final acceptance.

Key Takeaways

  • Always call 811 before excavation and keep clearance documentation on-site.
  • Obtain the city right-of-way/excavation permit before starting work.

Help and Support / Resources


  1. [1] City of Savannah Right-of-Way Permit and Public Works permit information
  2. [2] Georgia 811 utility locating service