Hollywood, Florida ADU Permit Guide

Housing and Building Standards Florida 3 Minutes Read ยท published February 21, 2026 Flag of Florida

Permitting an accessory dwelling unit (ADU) in Hollywood, Florida requires following local zoning and building rules, submitting plans, and obtaining the appropriate building permits. This guide explains the typical municipal steps, identifies the enforcing departments, lists required documentation, and shows where to find the official code and permit resources for Hollywood, Florida. Use this as a practical checklist to prepare plans, contact the Planning or Building divisions, and avoid common enforcement issues.

Overview of ADU rules in Hollywood

Accessory dwelling units are generally controlled by local land-use and building regulations that specify location, size, parking, utility connections, and occupancy limits. For Hollywood, consult the City of Hollywood municipal code and the Planning/Building departments for precise zoning allowances and any overlay or neighborhood restrictions[1].

Start with a pre-application meeting with Planning to confirm zoning and submittal needs.

Penalties & Enforcement

The City of Hollywood enforces compliance with land-development and building codes through administrative orders, permit stop-work notices, and civil penalties. The specific code sections, fines, and escalation timeline should be confirmed in the municipal code and with Code Enforcement.

  • Fines: not specified on the cited page.
  • Escalation: not specified on the cited page for first vs repeat or continuing offences.
  • Non-monetary sanctions: stop-work orders, orders to remove or demolish illegal structures, and court enforcement actions are used.
  • Enforcer: City of Hollywood Code Enforcement, Building Division, and Planning Division handle inspections, complaints, and compliance.
  • Appeals and review: appeal routes typically go through administrative review or local special magistrate; specific time limits are not specified on the cited page.
If enforcement action is started, contact Code Enforcement immediately to learn appeal deadlines.

Applications & Forms

The City issues building permit applications and plan submittal checklists through its Building Division; zoning/variance requests are handled by Planning. Specific form names, numbers, and fees are listed on official permit pages or in the municipal code where available. If a specific form or fee is not published on the cited page, it is noted as not specified on the cited page.

  • Building permit application: see City Building Division permit portal for submittal steps and required documents.
  • Zoning/variance application: submit to Planning for review if the ADU requires relief from dimensional or use standards.
  • Fees: not specified on the cited page; confirm current fees with Building Division prior to submittal.

Application process and common requirements

Typical municipal steps include zoning verification, plan preparation by a licensed design professional, formal permit application, plan review, permit issuance, and inspections during construction. Expect to provide scaled site plans, floor plans, structural drawings, utility connections, and parking plans when applicable.

  • Zoning check: confirm ADU is allowed in your zoning district.
  • Pre-application meeting: optional but recommended to identify constraints and submittal requirements.
  • Plan submission: building and structural plans for review.
  • Inspections: required at standard construction milestones.

Common violations and typical outcomes

  • Constructing without a permit: may trigger stop-work order and enforcement fines.
  • Noncompliant setbacks or size: may require removal or variance application.
  • Occupancy or utility violations: could result in utility disconnection orders until corrected.

How to

  1. Verify zoning and ADU allowance with Planning; request a pre-application meeting if needed.
  2. Prepare plans and documentation per Building Division requirements.
  3. Submit the building permit application and pay applicable fees.
  4. Complete required inspections and obtain the Certificate of Occupancy before renting or occupying.
Do not occupy an ADU before the final inspection and Certificate of Occupancy are issued.

FAQ

Can I build an ADU on my Hollywood single-family lot?
Eligibility depends on zoning district rules and lot standards; check the City code and contact Planning to confirm whether your parcel allows an ADU[1].
How long does permitting usually take?
Processing and review times depend on plan complexity and completeness; specific timelines are not specified on the cited page and should be confirmed with the Building Division.

Key Takeaways

  • Start with zoning verification to avoid wasted design costs.
  • Submit complete building plans to reduce review cycles.

Help and Support / Resources


  1. [1] City of Hollywood Code of Ordinances - municipal code and zoning provisions