Davie ADU, Elevator & Lead Abatement Permits

Housing and Building Standards Florida 3 Minutes Read · published March 01, 2026 Flag of Florida

Davie, Florida homeowners and property managers seeking accessory dwelling unit (ADU) permits, elevator approvals for apartments, or guidance on lead-abatement work must follow Town of Davie zoning and building rules plus the Florida Building Code. This guide explains which local departments enforce requirements, where to find official forms, how inspections and complaints work, and what to expect for penalties and appeals in Davie.

Permitting basics

ADUs and elevator installations are regulated through Davie’s Building Division and by reference to the Florida Building Code. Before starting construction or lead-abatement work, confirm zoning approval, submit construction plans, and obtain any required trade permits. For zoning allowances, review the Town of Davie municipal code and the Building Division permit procedures and check whether your property requires variances or special permits. [1]

  • Check zoning for ADU allowance and lot standards.
  • Prepare architectural and structural plans per the Florida Building Code.
  • Submit permit application and required documents to Davie Building Division.[2]
  • Schedule plan review and inspections as required.
  • Pay permit and plan-review fees at application.
Always confirm permit submittal checklists with the Building Division before filing.

Applications & Forms

The Town of Davie publishes permit application forms, checklist items, and instructions through the Building Division. If a specialized lead-abatement form is required, the Building Division or Environmental Health office will indicate it at intake. For elevator permits and inspections, ensure plans note compliance with applicable elevator codes and maintenance requirements. [3]

  • Permit application (building/electrical/mechanical/plumbing) — use the Davie Building Division submission process.
  • Fees — listed on permit fee schedule or not specified on the cited page.
  • Deadlines — follow timing indicated by plan review and permit issuance notices.

Penalties & Enforcement

Enforcement of building, zoning, and safety violations in Davie is handled by the Building Division and Code Enforcement. Specific monetary fines and schedules for ADU, elevator, or lead-abatement violations are not consistently listed on the municipal pages and therefore may be described in the Town code or cited at case intake; where a specific penalty amount is not posted, the official resource is referenced below. [1]

  • Monetary fines: not specified on the cited page; consult the municipal code or notice of violation for exact amounts.
  • Escalation: first, repeat, and continuing offences procedures are handled by Code Enforcement and may include daily continuing fines where authorized by ordinance; specific ranges are not specified on the cited page.
  • Non-monetary remedies: stop-work orders, orders to obtain permits, removal or correction directives, abatement orders, and referral to the town attorney for civil action.
  • Enforcer: Town of Davie Building Division and Code Enforcement divisions; complaints and inspections are initiated via the town’s official contact pages.[2]
  • Appeals/review: appeals typically follow the procedure in the municipal code or are heard by the local board/commission identified in the code; time limits for appeal are not specified on the cited page and should be confirmed with the Building Division.
  • Defences and discretion: permitting of after-the-fact applications, variance requests, demonstrated good-faith efforts to comply, or emergency repairs may be considered per town procedures.
If a stop-work order is issued, do not resume work until the order is lifted by the Building Division.

Common violations

  • Construction without a permit (including unpermitted ADUs).
  • Improper elevator installations or lack of required inspections.
  • Failure to follow lead-abatement protocols or licensed contractor requirements.

How-To

  1. Confirm ADU zoning and setback allowances with Davie Planning and Zoning.
  2. Hire licensed professionals to prepare plans meeting the Florida Building Code.
  3. Complete and submit the Building Division permit application with plans and fees.[2]
  4. Respond to plan-review corrections and schedule required inspections.
  5. Obtain final approvals and certificates of completion before occupying the ADU or placing elevators in service.
Do not occupy or use work subject to a stop-work order or without a final inspection sign-off.

FAQ

Do I need a permit to build an ADU in Davie?
Yes. Most ADUs require zoning clearance and building permits processed through the Town of Davie Building Division. Check zoning allowances first.
Who inspects apartment elevators?
Elevator inspections and code compliance rely on building inspections and the applicable state code; coordinate with the Davie Building Division for local inspection scheduling.
Are there special rules for lead abatement?
Lead-abatement work typically requires licensed contractors and compliance with state and federal standards; check requirements at permit intake and with the Building Division.

Key Takeaways

  • Obtain zoning clearance and building permits before starting ADU, elevator, or lead-abatement work.
  • Follow Florida Building Code standards and respond promptly to plan-review comments.

Help and Support / Resources


  1. [1] Town of Davie Building Division
  2. [2] Town of Davie Municipal Code (Municode)
  3. [3] Florida Building Code / Florida Building Commission