Little Rock Sewer Connection Fees & Permit Guide

Utilities and Infrastructure Arkansas 3 Minutes Read ยท published February 10, 2026 Flag of Arkansas

In Little Rock, Arkansas, connecting a property to the municipal sanitary sewer system requires permits, inspections and payment of connection or tap fees. This guide summarizes who enforces sewer connections, how to apply for permits, typical steps contractors and homeowners follow, and where to find official forms and contacts. Always confirm requirements with the city departments listed below before scheduling work.

Overview of sewer connection process

The process typically involves submitting a plumbing or sewer tap permit application, paying any connection or capacity fees, coordinating an inspection, and ensuring the work meets city standards for materials and backfill. Responsibility for securing a permit rests with the property owner or a licensed contractor. For official department contact and service descriptions see the city Wastewater Department page [1] and the city permit information page [2].

Fees and charges

  • Connection/tap fee amount: not specified on the cited page [1].
  • Capacity or impact charges: not specified on the cited page [1].
  • Permit application processing fees: not specified on the cited page [2].

Penalties & Enforcement

The City of Little Rock enforces sewer connections through its wastewater and permitting divisions. Specific monetary fines and daily penalties for unlawful connections or tampering with the sewer system are not specified on the cited pages; consult the enforcement contacts below to request the exact code sections and penalty schedules [1].

  • Enforcer: Little Rock Wastewater / City Permitting Division [1].
  • Fine amounts: not specified on the cited page; contact the department for current figures [1].
  • Escalation: first, repeat or continuing offence procedures are not specified on the cited page [1].
  • Inspection and complaint pathway: report illegal connections or sewer overflows to the Wastewater Department via the city contact page [1].
  • Appeal/review routes and time limits: not specified on the cited page; request appeals information from the permitting office [2].
  • Non-monetary sanctions: orders to disconnect, corrective work orders, and referral to court or municipal enforcement are the typical remedies though specific remedies are not detailed on the cited pages [1].
Contact the Wastewater Department early to confirm fees and required documents.

Applications & Forms

Common filings include a plumbing permit and a sewer tap or connection application; however, the city pages consulted do not publish the exact form names or numbers online. Apply for permits through the city permit center and submit required documents as instructed by the permitting staff [2].

Required inspections and standards

  • Pre-installation inspection requirements: not specified on the cited page [2].
  • Final inspection and approval: schedule with the city permit office after work completion [2].
  • As-built or record drawings: submission requirements not specified on the cited page [2].

Action steps

  • Verify whether a sewer tap or plumbing permit is required by contacting the permit center [2].
  • Request fee schedules from the Wastewater Department before committing to a contractor [1].
  • Schedule inspections promptly after work is ready; do not cover work before approval [2].
  • If cited for violations, ask the enforcing office for written orders and appeal instructions immediately [1].

FAQ

How much will the sewer connection cost?
Connection and capacity fee amounts are not specified on the cited pages; contact the Wastewater Department for current fees.
Who must obtain the permit?
The property owner or a licensed contractor must obtain the required plumbing or sewer tap permits through the city permit center.
What happens if I connect without a permit?
Unauthorized connections can result in enforcement actions, corrective orders, fines and referral to court; exact penalties are not specified on the cited pages.

How-To

  1. Contact Little Rock Wastewater to confirm sewer availability and fee schedule [1].
  2. Apply for the required plumbing or sewer tap permit at the city permit center and pay any application fee [2].
  3. Hire a licensed contractor to perform the connection according to city standards and codes.
  4. Schedule inspections with the permit office during rough-in and after completion.
  5. Obtain final approval and pay any outstanding connection or capacity charges.
  6. Retain copies of permits, inspection reports and receipts for future property transfers.

Key Takeaways

  • Confirm fees and permit types with city departments before starting work.
  • Use the permit center for applications and schedule inspections to avoid enforcement.

Help and Support / Resources


  1. [1] City of Little Rock Wastewater Department - Sewer service and contacts
  2. [2] City of Little Rock Permit Center - permits, inspections and submissions